Location:Home > Household > Waterproof coating
Waterproof coating

"Runtu" acrylic waterproof coating(E-303)

      Specifications:
  • 1 kg/barrel, 5 kg/barrel, 10 kg/barrel, 20 kg/barrel
      Implementation standards:
      Views:
  • Frequency
      Downloads:
Product Description

Elokt E - 303 acrylic ester waterproof coating is a kind of acrylate emulsion as basic material, adding a variety of additives and fillers is processed by meticulously one-component high quality water based waterproof coating.

 

Main Features

1. Open barrels and use, simple and convenient construction, suitable for home decoration waterproof;

2. Low VOC, with water as dispersion medium, no solvent pollution, non-toxic harmless, environmental protection products;

3. Can be in damp base construction, has good air permeability; Excellent high and low temperature resistance;

4. Good flexibility, elongation, with excellent crack resistance.


 

Where to use

Roof, hutch defends, basement, of water proof and seepage proof of pool, wall and wood floor moistureproof.


 

Construction Technology

1. The base level requirements: base should be solid, smooth, clean, no floating ash and oil, inside and outside Angle should be circular. Before the construction, such as base bibulous rate is large or relatively dry, available water along the base level, but you can't have water.

2. The coating: use a brush or through direct coating, should besmear commonly 2-3 times; Besmear after the first pass dry (about 3 hours) before besmear to brush the second time, the second time to the first time brushing direction perpendicular. The second time (about four hours) after dry solid can besmear brushs a third time, and with the second time brushing direction perpendicular; In the corner and tube root to besmear again.

3. The subsequent working procedure on the waterproof layer, should be carried out after coating is dry solid.

 

 

Technical Data Sheet

Item 

 Index  

III

 Solid content  ≥

65%

Tensile strength ,MPa≥

1.01.5

Elongation at break ,%≥

300300

Low temperature flexibility,around 10 mm rod bent 180

-10℃ No crack -20℃ No crack 

Impermeability(0.3MPa,30min)

Impermeable

Drying time 

Surface drying time 

≤4h

Fully drying time

≤8h

 


Matters Attention

1. The temperature is lower than 5 ℃ when crossing construction;

2. The leakage engineering construction, sandstorm days should not be rain and snow days;

3. The grassroots have water, leakage part should be handle in advance before the construction.


 

Dosage of reference

Every time is about 0.5 kg per square metre


 

Packing Specification

1 kg/barrel, 5 kg/barrel, 10 kg/barrel, 20 kg/barrel


 

Transportation and Storage

1. This product is not flammable and explosive materials, according to general cargo transportation, transportation should prevent sun, cold;

2. Storage temperature should not be less than 5 ℃;

3. The shelf life of 12 months.


 

Safety Guidelines

This product is a water-based non-toxic products, please put on the gloves and other protective measures when using, accidentally or sticky clothes, please use clear water is rinsed clean.

Construction
MEMBRANE
COATING
HDPE Drainage Board
PLADEN Metal roof
Waterproof system
Household
Waterproof coating
Ceramic adhesive series
Tile grout series
Water resistance putty series
Other auxiliary materials
Repairing
ZT-SERIES
Solution
About Us
About Us
Corporate Culture
Production base
Honors
Strategic Alliance
College
Service Support
Technical Papers
Product Authenticity check
Construction Technology
Download
E-zine
Media Center
News
Industry Buzz
Video
Dealer dynamic
Information
Classical Projects
Major national projects
Railways, tunnels, airport pro
Municipal Engineering
Real estate project
Civil engineering
Join us
Talent Concept
Campus Recruiting
Social recruitment
Contact us
Contact
Feedback